St. Francis Hospital
https://www.definitivepiping.com/apps/photos/
St. Francis Hospital Heating and Air Handler Units are being installed at St. Francis Hospital.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139112
195139112Triple duty valve being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139115
195139115A Look at the pump being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139116
195139116Pump Installed and being tightened up.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139119
195139119Suction Piping being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139117
195139117A look at the piping being installed for the pumps.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139114
195139114Flanged elbow with drain down to be installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139118
195139118Suction Side Piping being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139120
195139120Piping of the pump is finally done.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139113
195139113A look at both pumps at final installation.
https://www.definitivepiping.com/apps/photos/photo?photoID=195139121
195139121View of new Discharge gauge on pumps.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259627
195259627Drain point installed on new pumps.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259628
195259628Hot Water tie in point for second floor. (view #1) Basement MER
https://www.definitivepiping.com/apps/photos/photo?photoID=195259617
195259617Another look at the hot water piping for the second floor.(View #2) Basement MER
https://www.definitivepiping.com/apps/photos/photo?photoID=195259618
195259618View #3 of second floor hot water piping in basement MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259619
195259619View #4 of second floor hot water piping in basement MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259620
195259620View #5 of second floor hot water piping in basement MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259629
195259629Hot Water return for first floor. ( View #1)
https://www.definitivepiping.com/apps/photos/photo?photoID=195259621
195259621Another look of View #1 of first floor hot water piping.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259622
195259622View #2 of first floor hot water piping.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259623
195259623Tie in point for the First Floor Hot Water Return
https://www.definitivepiping.com/apps/photos/photo?photoID=195259625
195259625First Floor Hot Water Supply Main tie in point.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259624
195259624New shut off valve for the first floor hot water supply
https://www.definitivepiping.com/apps/photos/photo?photoID=195259630
195259630First Floor Hot Water Supply and Return being fed from basement MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=195259626
195259626Steam Supply being fed from basement taps to roof top unit.
https://www.definitivepiping.com/apps/photos/photo?photoID=195196968
195196968Steam Supply and Return in basement hallway headed up to the first floor.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292197
195292197Steam Supply on first floor headed up to the second floor then to the roof top units.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292190
195292190Another view of the steam supply on the first floor.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292201
195292201Steam Return tie in points in basement hallway (uninsulated pipe)
https://www.definitivepiping.com/apps/photos/photo?photoID=195292198
195292198A view of Steam Supply and Return on first floor.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292192
195292192A view of Steam Return welded joint.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292193
195292193A view of Steam Supply and Return.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292194
195292194Another view of the Steam Supply and Return.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292196
195292196Placing Insulation Saddles on the pipe and their hangers.
https://www.definitivepiping.com/apps/photos/photo?photoID=195292195
195292195A look at Steam Supply and Return on second floor headed up to the roof.
https://www.definitivepiping.com/apps/photos/photo?photoID=195390788
195390788Opening in walls where pipe will eventually pass through and up to the roof.
https://www.definitivepiping.com/apps/photos/photo?photoID=195390789
195390789A look at the Steel which will hold RTU-2 (Air Handler #2)
https://www.definitivepiping.com/apps/photos/photo?photoID=195390790
195390790Steel Frame which will hold RTU-3 ( Air Handler #3)
https://www.definitivepiping.com/apps/photos/photo?photoID=195390791
195390791Steel Frame for RTU-1 being worked on. (Air Handler #1)
https://www.definitivepiping.com/apps/photos/photo?photoID=195390792
195390792Crane on site and being ready to put into place .
https://www.definitivepiping.com/apps/photos/photo?photoID=195410393
195410393Setting up the Crane with Able Rigging.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410394
195410394A look at RTU-3 on the truck (air handler #1)
https://www.definitivepiping.com/apps/photos/photo?photoID=195410416
195410416Unpacking the units and setting up for the rig up.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410415
195410415Sending up a piece of unit #1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410417
195410417Another view of pieces of unit #1 going up.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410420
195410420A look at unit #2 on the truck being unpacked.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410408
195410408Unit #2 and #3 on the trailer and being unpacked and being set up to rig.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410396
195410396Rigging up part of unit #2
https://www.definitivepiping.com/apps/photos/photo?photoID=195410411
195410411Parts of Unit #2 on the way up to the roof.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410395
195410395Parts of unit #2 on the way up.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410398
195410398Parts of Unit #2 being put in place.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410399
195410399A look at unit #2 on the steel.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410410
195410410Unit #3 being slung and shackled up.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410401
195410401Another look at unit #3 in one piece.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410403
195410403Unit #3 up in the air and ready to be set in place.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410404
195410404A look at unit #3 being rigged in one piece.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410405
195410405A look at unit #3 on the steel.
https://www.definitivepiping.com/apps/photos/photo?photoID=195410407
195410407Onsite fabrication of Steam piping for Unit ACU-2.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685574
195685574Insulated steam piping and condensate return piping being shown.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685575
195685575following the route of both steam supply and condensate return.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685576
195685576Insulated steam piping and condensate return piping headed towards the roof.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685577
195685577Steam supply and condensate return headed up to the roof.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685578
195685578Another look at the piping headed up through the roof.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685579
195685579Maintaining Carrier warranty we spun the steam coil to the other side of then unit. 360 spin.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685580
195685580Chill Water Supply and Return from main being piped up to RTU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685582
195685582Another view of the Chill Water piping for RTU-1 coming up alongside the building to the higher roof top.
https://www.definitivepiping.com/apps/photos/photo?photoID=195685583
195685583Chill Water Supply and Return sticking up above the side of the building ready to be continued to RTU-1
https://www.definitivepiping.com/apps/photos/photo?photoID=195685581
195685581Chill Water Piping to AHU-2 **VIEW #1**
https://www.definitivepiping.com/apps/photos/photo?photoID=195886786
195886786onsite fabrication of the chill water piping.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886797
195886797Another view of the chill water piping to AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886793
195886793Another look at the chill water piping for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886787
195886787Connecting Chill Water piping to AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886794
195886794Another view of the chill water piping for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886788
195886788Another view of the chill water piping for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886798
195886798New shut off valve installed on the Steam piping for AHU0-1
https://www.definitivepiping.com/apps/photos/photo?photoID=195886789
195886789Steam Supply piping for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886790
195886790Connecting Steam Supply Piping to AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886791
195886791Another view of the Steam Supply Piping to AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886792
195886792A view of steam return trap being installed for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886807
195886807Another view of Steam Return Trap for AHU-2.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886808
195886808Steam return trap being installed for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886809
195886809Steam Supply By-Pass being installed for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886810
195886810Another view of the Steam Supply By-Pass along with Steam Return being installed for AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886811
195886811Steam Supply By-pass installed on AHU-2
https://www.definitivepiping.com/apps/photos/photo?photoID=195886812
195886812Vacuum Break being installed on Steam Return for AHU--2.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886814
195886814Another view of Return piping for AHU-2.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886813
195886813Steam Return at final installation.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886818
195886818On site fabrication for Chill Water piping for AHU-1 in progress.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886796
195886796More onsite fabrication for Steam Supply Piping for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886799
195886799Chill Water being installed for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886815
195886815A look at Chill Water piping for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886817
195886817Chill Water for AHU-1 being fabricated.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886800
195886800Chill Water piping being fabricated on site for AHU-1
https://www.definitivepiping.com/apps/photos/photo?photoID=195886816
195886816A View of of Steam Supply piping and Chill Water piping to AHU-1 (left to right)
https://www.definitivepiping.com/apps/photos/photo?photoID=195886801
195886801A View of the Steam Supply Piping for AHU-1 being welded into place.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886802
195886802A view of Chill Water Piping form new tie in point on the roof below being welded.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886803
195886803Chill Water Supply and Return feeding AHU-1 from lower rooftop.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936428
195936428Tie in points for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156842
196156842Onsite fabrication of chill water piping. rain or shine
https://www.definitivepiping.com/apps/photos/photo?photoID=195936429
195936429Steam Coil being rotated while maintaining warranty.
https://www.definitivepiping.com/apps/photos/photo?photoID=195886804
195886804A view of Steam Supply piping for AHU-1
https://www.definitivepiping.com/apps/photos/photo?photoID=195904949
195904949New shut off valves,strainers,control valve for Steam Supply Piping for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195904948
195904948A view of the Steam Supply for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195904950
195904950Another View of the Steam Supply for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195904951
195904951Screwing the flange on ACU-1 and preparing to connect.
https://www.definitivepiping.com/apps/photos/photo?photoID=195904952
195904952Steam Supply is connected to AHU-1 and finished.
https://www.definitivepiping.com/apps/photos/photo?photoID=195904953
195904953Steam Condensate Return being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936419
195936419Steam Supply and Return being fed from basement for AHU-1
https://www.definitivepiping.com/apps/photos/photo?photoID=195936417
195936417Steam Supply and Condensate Return for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936416
195936416Steam Condensate return being installed for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936413
195936413Another view of the Steam Condensate Return for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936414
195936414Steam Condensate Return headed over to unit AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936420
195936420Another view of the Steam Condensate Return piping for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936418
195936418Steam Condensate Return trap being installed off the unit AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936421
195936421Steam Condensate Return Bypass being installed
AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936422
195936422Steam Condensate Return Bypass installed for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936424
195936424AHU-1 Steam Condensate Return vacuum breaker and radiator valve.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936425
195936425Steam Condensate Trap installed 1 of 2 for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936426
195936426Steam Supply and Condensate Return with traps, gauges all installed for AHU-1.
https://www.definitivepiping.com/apps/photos/photo?photoID=195936427
195936427Beginning installation on AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=195988311
195988311Steam Supply piping being installed for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=195988310
195988310Steam Supply installed on AHU-3
https://www.definitivepiping.com/apps/photos/photo?photoID=195988312
195988312Raining off and on job must get done. Temp Tent.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156843
196156843Chill Water Piping for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156844
196156844Another view of Chill Water Piping for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156845
196156845View #3 of Chill Water piping for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156846
196156846Measuring up for the Chill Water Piping.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156847
196156847Measuring for the steam piping for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156848
196156848Thermometer and gauges go in for Chill Water piping on AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156852
196156852Steam Piping for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156853
196156853Welding in the taps for gauges.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156854
196156854A View of the gauges and thermometer for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156855
196156855Steam Condensate return for AHU-3.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156856
196156856Another view of the Steam Condensate Return.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156857
196156857Steam Return traps being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156858
196156858Two new Valves installed on chill water.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156860
196156860Final view of total piping for AHU-3. All Units are piped in fully.
https://www.definitivepiping.com/apps/photos/photo?photoID=196156859
196156859