Cornell University Chiller Welding
https://www.definitivepiping.com/apps/photos/
Cornell University Chiller Welding 1 of 2 flanges on chiller. Cleaned and ready for reinstallation.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971538
1889715382 of 2 flanges on chiller. Also, cleaned and read for reinstallation.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971548
188971548Pieces that were cut out so the coil can be removed and plugged.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971546
188971546Aligning the old pieces up and preparing to weld.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971549
188971549Piping bolted up and ready to weld.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971541
188971541Welding of piece 1 of 2 in progress.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971539
188971539A look of the main piping before piece is bolted up and aligned for welding.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971536
188971536Aligned, Bolted up and awaiting welding procedure.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971547
188971547Tacking up of piece 2 of 2.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971335
188971335Welding of piece 2 of 2 in progress.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971543
188971543View of the Welds that were done. Piping Installed and chiller is ready for use.
https://www.definitivepiping.com/apps/photos/photo?photoID=188971334
188971334