Museum of the City of New York
https://www.definitivepiping.com/apps/photos/
Museum of the City of New York MCNY Preserv & Modern Phase 3
https://www.definitivepiping.com/apps/photos/photo?photoID=186219944
186219944Area for future Mechanical Room
https://www.definitivepiping.com/apps/photos/photo?photoID=186219954
186219954Another look of the Mechanical Room
https://www.definitivepiping.com/apps/photos/photo?photoID=186219956
186219956Duct/Boiler Room Tunnel where hot water pipe is ran.
https://www.definitivepiping.com/apps/photos/photo?photoID=186219950
186219950Coring holes for the Hot Water Supply and Return to Duct / Boiler Room Tunnel.
https://www.definitivepiping.com/apps/photos/photo?photoID=186219948
186219948Hot Water Supply and Return.
https://www.definitivepiping.com/apps/photos/photo?photoID=186219949
186219949Another look of Hot Water Supply and Return
https://www.definitivepiping.com/apps/photos/photo?photoID=186219953
186219953Hot Water Supply and Return entering the floor down to the Tunnel.
https://www.definitivepiping.com/apps/photos/photo?photoID=186219952
186219952Hot Water Piping in the Tunnel.
https://www.definitivepiping.com/apps/photos/photo?photoID=186219947
186219947Another look of the Hot Water piping in the tunnel with drain points.
https://www.definitivepiping.com/apps/photos/photo?photoID=186219945
186219945Chill Water Mains still to be ran. (Welding in progress)
https://www.definitivepiping.com/apps/photos/photo?photoID=186219946
186219946Chill Water Piping Layout on ground. All work prefabricated onsite.
https://www.definitivepiping.com/apps/photos/photo?photoID=186664715
186664715Another look at the Chill Water layout..
https://www.definitivepiping.com/apps/photos/photo?photoID=186664716
186664716Prefabrication of Chill Water pipe to be lifted into place.
https://www.definitivepiping.com/apps/photos/photo?photoID=186664710
186664710Prefabrication of Chill Water one up and one down still waiting to be rigged.
https://www.definitivepiping.com/apps/photos/photo?photoID=186664714
186664714Low Pressure Steam & Chill Water Piping off the ground and in position.
https://www.definitivepiping.com/apps/photos/photo?photoID=186664711
186664711(Left to Right) Low Pressure Steam,Chiller Water Supply and Return awaiting approval on steal work to make connection.
https://www.definitivepiping.com/apps/photos/photo?photoID=186664713
186664713Running the Hot Water, Chill Water & Drain piping on the main floor.
https://www.definitivepiping.com/apps/photos/photo?photoID=190972299
190972299Another view of the Hot Water, Chill Water,& Drain being ran on the main floor.
https://www.definitivepiping.com/apps/photos/photo?photoID=190972300
190972300First Unit has arrived on site (Biggest of 3 unit)
https://www.definitivepiping.com/apps/photos/photo?photoID=192019262
192019262Bringing the unit in pieces into the building and down to staging area awaiting RIG into the MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019265
192019265Setting rollers under the unit for easy moving.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019266
192019266Chain Block RIG from the first floor ready to drop the unit.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019267
192019267RIG set up to bring unit into basement MER through the floor.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019272
192019272Rigging piece number one in progress.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019268
192019268Another view of piece number one clearing the floor.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019269
192019269Another view of piece number one almost in MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019270
192019270Piece number 2 being lowered into the MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019273
192019273Rotating piece number 2 to clear concrete pads.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019274
192019274Unit number 1 in MER staging area not set into position yet.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019277
192019277Unit 2 in MER staging area again still not set into position.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019278
192019278Piece number 3. One of the 2 biggest pieces. Being set up for RIG. General Contractor still has to make floor opening bigger in order to fit unit.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019280
192019280Piece number 3 being staged until RIG into the MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=192019279
192019279Piping for Fan Coil Unit in lobby coming up from the basement to the unit.
https://www.definitivepiping.com/apps/photos/photo?photoID=195196975
195196975Tie in points to the fan coil unit.
https://www.definitivepiping.com/apps/photos/photo?photoID=195196974
195196974Setting up Wet Tap machine.
https://www.definitivepiping.com/apps/photos/photo?photoID=195390808
195390808Final look at the Wet tap machine all set.
https://www.definitivepiping.com/apps/photos/photo?photoID=195390803
195390803Wet Tap being performed on Hot Water Return.
https://www.definitivepiping.com/apps/photos/photo?photoID=195390804
195390804Wet Tap being performed on Hot Water Supply.
https://www.definitivepiping.com/apps/photos/photo?photoID=195390805
195390805Hot Water Supply and Return being connected.
https://www.definitivepiping.com/apps/photos/photo?photoID=195390806
195390806Keeping the Hot Water Supply and Return pipe close to the ceiling
https://www.definitivepiping.com/apps/photos/photo?photoID=195390807
195390807Running the chill water piping along the wall.
https://www.definitivepiping.com/apps/photos/photo?photoID=196736418
196736418Another view of the chill water piping along the wall.
https://www.definitivepiping.com/apps/photos/photo?photoID=196736419
196736419Vav boxes in MER being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491222
197491222Chill Water Riser Taps being done.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491227
197491227Chill Water piping for AHU 1 of 3 being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491226
197491226Another view of AHU 1 of 3 Chill Water being installed. (Valves off of the riser)
https://www.definitivepiping.com/apps/photos/photo?photoID=197491229
197491229Another view of the valves from the riser being installed for AHU 1 of 3.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491230
197491230Chill Water to 1 of 3 AHU installed fully with gauges and thermometer.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491224
197491224Chill Water to AHU 2 of 3 being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491225
197491225AHU 3 of 3 Chill water piping being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491232
197491232Another view of 3 of 3 Chill Water piping being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491233
197491233Valves for AHU 3 of 3 Chill Water being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491234
197491234Piping form existing taps for two new hot water coils.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491337
197491337Piping for Hot Water coils being installed
https://www.definitivepiping.com/apps/photos/photo?photoID=197491336
197491336Hot Water coils being installed in existing MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491235
197491235Condensate pump being installed.
https://www.definitivepiping.com/apps/photos/photo?photoID=197491223
197491223