Hospital for Special Surgery Chiller Replacement
https://www.definitivepiping.com/apps/photos/
Hospital for Special Surgery Chiller Replacement
https://www.definitivepiping.com/apps/photos/photo?photoID=177615379
17761537910" Low Pressure steam strainer and valve that are being removed.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615056
177615056Insulation being removed from chill water piping.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615057
177615057Piping that will be dismantled and discarded.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615058
177615058Steam trap that will be removed from chiller's side.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615059
177615059Old Chiller
https://www.definitivepiping.com/apps/photos/photo?photoID=177615060
177615060Rigging down the Chill Water lines.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615063
177615063Both Chill Water lines removed.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615064
177615064Setting up Condenser piping to be rigged out.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615066
1776150663 of 4 lines removed. Ready to be cut up and discarded.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615067
177615067Condenser Line in the process of being rigged down.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615068
177615068All 4 Lines on chiller front removed.
https://www.definitivepiping.com/apps/photos/photo?photoID=177615069
17761506910" Valve safely being rigged down.
https://www.definitivepiping.com/apps/photos/photo?photoID=177660002
177660002All pipes, valves, strainers dismantled and ready for removal of chiller unit.
https://www.definitivepiping.com/apps/photos/photo?photoID=177660003
177660003New Trane Chiller ready for disassembly.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277037
178277037Economizer dismantled from chiller.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277038
178277038View of chiller without economizer.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277039
178277039Electrical panels removed from chiller.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277040
178277040View of remaining Condenser, Evaporator, Motor and Compressor.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277041
178277041Motor and Compressor removed.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277042
178277042Remaining Condenser and Evaporator still waiting for disassembly.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277043
178277043Oil tank lines cut and ready for removal.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277044
178277044Condenser rigged up and being removed.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277045
178277045Remaining lines and electrical ready to be removed from Evaporator.
https://www.definitivepiping.com/apps/photos/photo?photoID=178277046
178277046Cutting the leg off the Condenser. Legs need to be removed for more control and smoother Rig.
(With permission from Trane)
https://www.definitivepiping.com/apps/photos/photo?photoID=178342556
178342556Condenser on Chiller dollies all ready to go.
https://www.definitivepiping.com/apps/photos/photo?photoID=178342557
178342557Old Chiller removed and in pieces ready to be taken out.
https://www.definitivepiping.com/apps/photos/photo?photoID=178446102
178446102Pieces of the old chiller ready to be taken out.
https://www.definitivepiping.com/apps/photos/photo?photoID=178446103
178446103Motor being rigged into the MER.
https://www.definitivepiping.com/apps/photos/photo?photoID=178522491
178522491Motor is in now to get it to position.
https://www.definitivepiping.com/apps/photos/photo?photoID=178522492
178522492Condenser being rigged.
https://www.definitivepiping.com/apps/photos/photo?photoID=178522493
178522493Condenser being rigged. (pic 2)
https://www.definitivepiping.com/apps/photos/photo?photoID=178522494
178522494Condenser being wheeled to staging area before being put back together.
https://www.definitivepiping.com/apps/photos/photo?photoID=178522495
178522495Evaporator being rigged in.
https://www.definitivepiping.com/apps/photos/photo?photoID=178522496
178522496Evaporator placed into staging area. Until Further installation.
https://www.definitivepiping.com/apps/photos/photo?photoID=178522497
178522497Piped rigged up into staging area. Until further installation.
https://www.definitivepiping.com/apps/photos/photo?photoID=178522498
178522498Motor shackled ready to be rigged.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737802
178737802Evaporator and Motor being set into position.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737803
178737803Motor hanging in the air as Evaporator is positioned.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737804
178737804Cleaning Evaporator before setting in gaskets and attaching motor.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737805
178737805All three parts in position still have to put chiller on springs.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737806
178737806Pieces starting to be connected.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737807
178737807Attaching all the copper lines.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737808
178737808Electrical panel brackets welded and panels set into position.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737809
178737809Condensor return line being connected.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737811
178737811Condensor Supply and Return connected with thread-o-lets welded and guages and thermometer in.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737812
178737812Another image of Condensor Supply and Return Piping.
https://www.definitivepiping.com/apps/photos/photo?photoID=178737813
178737813View of all the piping in the final stages.
https://www.definitivepiping.com/apps/photos/photo?photoID=178992269
178992269Close Up of final stages of piping.
https://www.definitivepiping.com/apps/photos/photo?photoID=178992270
178992270Chill Water Supply and Return side by side.
https://www.definitivepiping.com/apps/photos/photo?photoID=178992272
178992272Chill Water Return relocated for a clean and neat look as well as more room in the MER. ( as seen in previous photo)
https://www.definitivepiping.com/apps/photos/photo?photoID=178992271
1789922713" Vent line coming off the chiller.
https://www.definitivepiping.com/apps/photos/photo?photoID=179041290
1790412903" Vent line continued to the outside of the building.
https://www.definitivepiping.com/apps/photos/photo?photoID=179041291
179041291Chiller Replacement is complete and awaiting start up.
https://www.definitivepiping.com/apps/photos/photo?photoID=179041292
179041292